Salvation Army Hall

  • The building was very damp and cold and the Salvation Army needed to refurbish the building as a comfortable place of worship.
  • Maclennan-LSE proposed the Delta Membrane system 500 with thermal insulation boards over.
  • Maclennan-LSE fitted the Delta Membrane system 500 from floor to ceiling to provide a dry surface to fit the thermal insulation boarding.
  • The finished building is now warmer and dry, the Delta Membrane is guaranteed for a period of 30 years.
salvation army hall image salvation army hall image
salvation army hall image salvation army hall image

See other Damp Proofing case studies below:

The Malt House
The Armoury
Dean's Farm

Or check out other Case Studies

Videos
Quick Call Back Form
  Call me ASAP
# # # # # # #